Water line installation results in traffic shift along section of Lakeside Drive in Lynchburg

Lynchburg & Central Virginia News
(Photo: Courtesy MGN Image)

(Photo: Courtesy MGN Image)

LYNCHBURG, Va. (WFXR) – A portion of Lakeside Drive in Lynchburg will have traffic shifting to the opposite travel lanes as crews will be installing water line piping in the area of the bridge over Blackwater Creek.

Work is being done during daylight hours of 9 a.m. to 3 p.m. each day through Friday, Nov. 19.

Lane shifts will occur in this area to keep traffic flowing while crews are working.

Motorists are being advised that minor delays could occur and caution should be used while traveling through the work zone.

This work is part of the Lakeside Drive Bridge Over Blackwater Creek Project.

For breaking news delivered to you, subscribe to WFXR’s breaking news email list

Get breaking news, weather, and sports delivered to your smartphone with the WFXR News app available on Apple and Android.

Copyright 2021 Nexstar Media Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

Latest News

More News

News Tip Form